Project category: independent shaft outside the building
Project address: No.38 yingshouli, Dongfeng West Road
Project Overview: due to the garbage delivery pipeline at the turntable of the stairs of the original building of Dongfeng West project, the structural hidden dangers of the original building should be considered when making the elevator installation plan, and the second floor is a large platform (balcony); Therefore, if the elevator corridor is made, it should be very detailed and comprehensive in terms of load-bearing; After the measurement and calculation of our engineers, it was finally determined to destroy the garbage transmission pipeline of the original building. At the same time, a concrete shaft was made outside the large platform, and a load-bearing beam structure was made on the platform, and then the platform was widened to the balcony load-bearing beam of all industries; Then weld the reinforcement in the structural beam of the original stair turntable platform with the reinforcement of the new platform. As soon as the case came out, the owners raised their thumbs up and agreed.